News|

๐“๐ฐ๐จ ๐‚๐ซ๐จ๐ฌ๐ฌ๐ข๐ง๐ ๐ฌ, ๐Ž๐ง๐ž ๐ƒ๐š๐ฒ: ๐‘๐ข๐›๐š๐ฅ๐ข๐ง๐ ๐ฆ๐ข & ๐๐ซ๐ฎ๐ฆ๐ข๐ซ๐ข ๐๐ซ๐ข๐๐ ๐ž๐ฌ ๐Ž๐ฉ๐ž๐ง

In the presence of Hon’ble Damcho Tenzin, Member of Parliament for Thrimshing-Kangpara Constituency, the Drungkhag Administration inaugurated two Bailey bridges that will change how this corner of Trashigang moves, trades, and lives: the Ribalingmi Bailey Bridge (120ft) and the Brumiri Bailey Bridge (110ft).

At Ribalingmi, what was once a crossing at the river’s mercy is now one built on certainty โ€” steel where uncertainty used to stand.

At Brumiri, the second bridge of the day was equally inaugurated โ€” another 24 MT crossing built to carry the gewog’s trucks, tractors, and taxis safely across, regardless of season.

Both bridges were funded by the Royal Government of Bhutan: Ribalingmi built by M/s Kezang Norbu Construction, Brumiri by M/s Norjung Construction. Together, they mean farmers no longer time their harvest around water levels, children walk to school on solid ground, and no one risks that crossing alone again.

Tashi Delek to Thrimshing Gewog. Two bridges, one day, a Dzongkhag moving forward.

๐Ÿšฉ Ribalingmi Bailey Bridge (120ft) & Brumiri Bailey Bridge (110ft) | Thrimshing Gewog | Trashigang Dzongkhag

Comments are closed.

Close Search Window